SETTING
TIME OF CEMENT
IS
8142 (1976): Method of test for determining setting time of concrete
by penetration resistance [CED 2: Cement and Concrete]
Ref: http://www.iitk.ac.in/ce/test/IS-codes/is.8142.1976.pdf
Initial
Setting Time - The
elapsed time, after initial contact of cement and water, required for
the mortar (sieved from the concrete) to reach a penetration
resistance of 3.43 N/mm2
( 35 kgf/cm2
)
Or
The
time at which cement starts hardens and completely loses its
plasticity is called Initial setting time of cement.
Or
The
time available for mixing the cement and placing it in position is an
Initial setting time of cement. If delayed further, cement loses its
strength.
The
initial setting time for OPC is 30 min
Final
Setting Time - The
elapsed time, after initial contact of cement and water, required for
the mortar (sieved from the concrete) to reach a penetration
resistance of 26.97 N/mm2
( 275 kgf/cm2)
Or
The
time at which cement completely loses its plasticity and became hard
is a final setting time of cement.
Or
The
time taken by cement to gain its entire strength is a Final setting
time of cement.
The
final setting time for OPC is 600 min
Test
for finding Initial
and Final Setting time of Concrete
APPARATUS
Vicat
apparatus conforming to IS: 5513-1976.
Balance
of capacity 1kg and sensitivity 1 gram.
Gauging
trowel conforming to IS: 10086-1982.
PROCEDURE
Unless
otherwise specified this test shall be conducted at a temperature of
27 +20 C and 65 + 5% of relative humidity of the Laboratory.
Prepare
a paste of 300 grams of cement with 0.85 times the water required to
a give a paste of standard consistency IS: 4031 (Part 4) 1988.
The
time of gauging in any case shall not be less than 3 minutes not
more than 5 minutes and the gauging shall be completed before any
sign of setting occurs.
Count
the time of gauging from the time of adding water to the dry cement
until commencing to fill the mould
Fill
the vicat mould with this paste making it level with the top of the
mould.
Slightly
shake the mould to expel the air.
In
filling the mould the operator hands and the blade the gauging
trowel shall only be used.
Initial
Setting Time
Immediately
place the test block with the non-porous resting plate, under the
rod bearing the initial setting needle.
Lower
the needle and quickly release allowing it to penetrate in to the
mould.
In
the beginning the needle will completely pierce the mould
Repeat
this procedure until the needle fails to pierce the mould for 5 +
0.5mm.
Record
the period elapsed between the time of adding water to the cement to
the time when needle fails to pierce the mould by 5 + 0.5mm as the
initial setting time.
Final
Setting Time
Replace
the needle of the vicat apparatus by the needle with an annular ring
Lower
the needle and quickly release.
Repeat
the process until the annular ring makes an impression on the mould.
Record
the period elapsed between the time of adding water to the cement to
the time when the annular ring fails to make the impression on the
mould as the final setting time.
REPORT
Report
the initial setting time and final setting time in minutes.
PRECAUTION
The
time of gauging in any case shall not be less than 3 minutes not more
than
5minutes
The
range of three results of properly conducted tests by the same
operator with the same machine using similar materials on different
days shall not exceed 4 minutes, and the average setting times for
two sets
of
tests each consisting of three similar batches shall not depart more
than
20
minutes from the average of the two.